Platform code3900625
Platform nameSOLO Profiling Float
DescriptionArgo SIO
Ascending Profiling Time13.098
Clock Drift0
Cycle Time249
Data CentreAO
Deepest Pressure1836
Deploy MissionKAH-leg18
Deploy PlatformR/V Kaharoa
Descending Profiling Time8.5983
DirectionA
End Mission Date11/01/2014 19:45:00
End Mission StatusT
Inst Reference2710
LABEL ENCTD_CNDC
LABEL ENCTD_PRES
LABEL ENCTD_TEMP
LABEL ENFLOAT
Launch Qc1
ParameterPRES
ParameterTEMP
ParameterPSAL
Parameter Accuracy1.5%
Parameter Accuracy0.002 degC
Parameter Accuracy0.002 psu
Parameter Resolution0.01 dbar
Parameter Resolution0.0001 degC
Parameter Resolution0.0001 psu
Parameter Unitspsu
Parameter UnitsdegC (ITS-90)
Parameter Unitsdbar
Parking Pressure1000
Parking Time213.334
Pi NameDEAN ROEMMICH
Platform MakerSIO_IDG
Platform ModelSOLO_SBE
Positioning SystemARGOS
Pr Experiment IdUS ARGO PROJECT
Pr Launch Datetime07/11/2007 02:03:25
Pr Launch Latitude-35.995
Pr Launch Longitude-84.989
Pr Probe Code851
Predeployment Calib CoefficientG = -1.004379E+00 H = 1.372035E-01 I = -3.294525E-04 J = 4.385628E-05 CPCOR = -9.570001E-08 CTCOR = 3.250000E-06 WBOTC = 9.219323E-08
Predeployment Calib CoefficientTA0 = -2.683317E-05 TA1 = 2.720585E-04 TA2 = -2.146395E-06 TA3 = 1.441821E-07
Predeployment Calib CoefficientPA0 = 7.385455E-01 PA1 = 1.382398E-01 PA2 = -3.687181E-08 PTCA0 = 2.852140E+01 PTCA1 = 3.554711E-01 PTCA2 = -5.217478E-03 PTCB0 = 2.601338E+01 PTCB1 = -3.250000E-04 PTCB2 = 0.000000E+00 PTHA0 = -6.797982E+01 PTHA1 = 5.292145E-02 PTHA2 = -5.726423E-07 POFFS
Predeployment Calib CommentConductivity Calibration Date 09 08 2007
Predeployment Calib CommentTemperature Calibration Date 09 08 2007
Predeployment Calib CommentPressure Calibration Date 09 08 2007
Predeployment Calib Equationf=INST_FREQ*sqrt(1.0+wBOTC*t)/1000.0;Conductivity=(g+h*f^2+i*f^3+j*f^4)/(1+delta*t+epsilon*p) Siemens/meter;t=temperature[degC];p=pressure[dbar];delta=CTcor;epsilon=CPcor;
Predeployment Calib EquationTemperature (ITS-90) = 1/{a0+a1[ln(n)]+a2[ln^2(n)]+a3[ln^3(n)]}-273.15 (oC);
Predeployment Calib Equationy=thermistor output;t=PTHA0+PTHA1*y+PTHA2*y^2;x=pressure output-PTCA0-PTCA1*t-PTCA2*t^2;n=x*PTCB0/(PTCB0+PTCB1*t+PTCB2*t^2);pressure(psia)=PA0+PA1*n+PA2*n^2;
Project NameUS ARGO PROJECT
Ptt23281
Repetition Rate1
SensorCTD_PRES
SensorCTD_TEMP
SensorCTD_CNDC
Sensor MakerDRUCK
Sensor MakerSBE
Sensor MakerSBE
Sensor ModelDRUCK_2900PSIA
Sensor ModelSBE41CP_V2
Sensor ModelSBE41CP_V2
Sensor Serial No1845
Sensor Serial No1845
Sensor Serial No2424869
Sensor Unitsdegree_Celsius
Sensor UnitsmS/cm
Sensor Unitsdecibar
Start Date Qc9
Surface Time14
Trans Frequency1/37
Trans Repetition37
Trans SystemARGOS
Trans System Id14281
Eulerian networksMyOcean eulerian platforms
Available dataFrom 06/11/2007 to 10/01/2014
Selected data

From ... to ... Refresh

Filters

Download time seriesTo download data, please login here
Download vertical profilesTo download data, please login here
Physical parametersNo valid measure for this period
Waterfall profiles